Demolition - House
|
||||||||||||||||||
| Title Page
Page 2 - Septic and Early Work Page 4 - Demolition - House Page 10 - Page 11 - Page 12 - Page 13 - Page 14 - Page 15 - Page 16 - Page 17 - Page 18 - Page 19 - Page 20 - Page 21 - Page 22 - Page 23 - |
![]() |
![]() |
||||||||||||||||
| Demolition of the house took 13 days in January. I striped everything down to the studs. The drywall and insulation proved to be unusable. The insulation was just R-11, even in the ceiling. Rodents had balled up most of the insulation into nests. Evidence of mice, rats, snakes, and possum was found in the attic. The space felt much better the minute I removed all the junk. The good wood will be reused and the rest was burned. All drywall and insulation was taken away in a dumpster. | ||||||||||||||||||
![]() |
||||||||||||||||||
![]() |
![]() |
|||||||||||||||||
![]() |
![]() |
![]() |
||||||||||||||||
![]() |
||||||||||||||||||
![]() |
||||||||||||||||||
![]() |
||||||||||||||||||