New Walls 1
|
|||||||||||||||||||||||
| Title Page
Page 2 - Septic and Early Work Page 6 - New Walls 1 Page 10 - Page 11 - Page 12 - Page 13 - Page 14 - Page 15 - Page 16 - Page 17 - Page 18 - Page 19 - Page 20 - Page 21 - Page 22 - Page 23 - |
![]() |
||||||||||||||||||||||
![]() |
|||||||||||||||||||||||
| The first wall I chose to replace was an interior load bearing wall. It was a tricky rebuild because the roof needed to be supported from the basement. The pictures will show the plate had to be replaced first. Second, the header for the joists was put in. Third, the joists and finally the stud wall. | |||||||||||||||||||||||
![]() |
|||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||
| Cores in the block wall foundation were cast with bolts to hold down a new plate. The photo below shows severe bug damage on the original plate. | |||||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||||
| The photo below and left shows a new plate and header. Right, are the new joists with supports still holding the roof from the basement. The last photo shows the finished stud wall. | |||||||||||||||||||||||
![]() |
|||||||||||||||||||||||
![]() |
|||||||||||||||||||||||
![]() |
|||||||||||||||||||||||
| Title Page 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 | 21 | 22 | 23 | 24 | |||||||||||||||||||||||