Basement Studio 2
|
|||||||||||||||||||||
| Title Page
Page 2 - Septic and Early Work Page 9 - Basement Studio 2 Page 10 - Page 11 - Page 12 - Page 13 - Page 14 - Page 15 - Page 16 - Page 17 - Page 18 - Page 19 - Page 20 - Page 21 - Page 22 - Page 23 - |
|||||||||||||||||||||
![]() |
|||||||||||||||||||||
| I built a block wall in front of the remaining rock and will cast a cement slab over the top. Some areas will be suitable table top height and the rest will be high storage space. | |||||||||||||||||||||
![]() |
|||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||
| Pictured on the left is the main work table framed up and ready for casting, a wedging table is on the right. | |||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||
| It works best to have two people pouring cement. One mixing and one casting. My friend Kenyon helped with some of the cement work. | |||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||
![]() |
![]() |
||||||||||||||||||||
| In all, six slabs had to be cast at six different heights to cover the boulders and beef up the foundation. I am really happy with the solution. An eye soar has been transformed into functional space. | |||||||||||||||||||||